Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 03/05/2024 Category: Roadway Current Phase: Planning and Project Approval
Flamingo/Edgewater Widening
Hillsborough Boulevard Water Main Project
Last Updated: 03/04/2024 Current Phase: Construction
This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Last Updated: 03/04/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.Last Updated: 03/04/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.Last Updated: 03/04/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new Fire Station at a location to be determinded.Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 03/04/2024 Category: Sidewalks Current Phase: Design Development
Construct multi-use path on Melbourne Street from U.S. 41 to Harborview Road.
Last Updated: 03/04/2024 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayCharlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 03/04/2024 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Last Updated: 03/04/2024 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstruction