Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Gillot & Blitman Waterway

Gillot & Blitman Waterway

Last Updated: 03/04/2024 Category: Roadway Current Phase: Design Development

Gillot Blvd roadway reconstruction

Read More

Charlotte Harbor CRA - Parmely Street road widening and sidewalk News Image

Charlotte Harbor CRA - Parmely Street road widening and sidewalk

Last Updated: 03/04/2024 Category: Roadway Current Phase: Design Development

Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.

Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.

Read More

Riverside Boat Ramp Replacement News Image

Riverside Boat Ramp Replacement

Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Design Development

As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues. 

Read More

William R. Gaines Jr. Veterans Memorial Park

William R. Gaines Jr. Veterans Memorial Park Sales Tax Project

Last Updated: 03/01/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval

Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.

Read More

Bissett Park

Bissett Park

Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval

Creation of park master plan and phase 1 development

The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season. 

Read More

Lake Betty Park

Lake Betty Park

Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval

Park master plan for Lake Betty Park

Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.

Read More

Myakka Park News Image

Myakka Park

Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval

Creation of a master plan through the park design process and phase 1 development.

Read More

Sheriff Administration and Hardened 911 Facility News Image

Sheriff Administration and Hardened 911 Facility Sales Tax Project

Last Updated: 03/01/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Planning and Project Approval

Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.

Read More

Sheriff District 4 HQ, Training Facility and K9 Unit News Image

Sheriff District 4 HQ, Training Facility and K9 Unit Sales Tax Project

Last Updated: 03/01/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction

Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us